Insights · Report · November 2026
Solar is a semiconductor industry. Its efficiency, materials and costs move on a documented roadmap. This outlook collects the independent data on where the technology is going, with every figure sourced and every projection labeled.
01
Laboratory records lead commercial modules by several years. In November 2023 a certified tandem cell first exceeded the 33.7% limit of any single-junction cell, and the industry roadmap expects every mainstream technology to keep improving.
Figure 1
Certified perovskite-silicon tandem efficiency rose from 33.9% to 35.5% between November 2023 and July 2026. These are laboratory cells, not commercial products.
Figure 2Includes projections
Average module efficiency in mass production, as surveyed and projected by 38 manufacturers, suppliers, research institutes and consultants. Industry averages; not Solarix data.
Silicon-based tandem modules, by the same survey: 27.4% in 2028 and 31% in 2036 (projections).
02
Module output per square meter equals efficiency times 1,000 W/m². Higher efficiency means fewer modules, less racking and less land per megawatt.
Sources: ITRPV 17th Edition (2026), efficiency × 1,000 W/m²; Bolinger & Bolinger, “Land Requirements for Utility-Scale PV,” IEEE Journal of Photovoltaics (2022), LBNL, plants built through 2019; acres per GWh derived from the 394 MWh per acre per year median. The tandem figure is a projection.
Figure 3Includes projections
Two-sided modules are the global majority, and nearly all new U.S. utility-scale capacity tracks the sun. The dashed bar is a projection.
03
Each watt is being made with less silicon and, by industry projection, far less silver. The roadmap expects heterojunction to see the steepest reduction.
Figure 4Includes projections
Silver paste is among the most expensive non-silicon materials in a cell. The roadmap expects heterojunction cells to use roughly two-thirds less by 2036 as copper replaces part of the paste. Industry medians; not Solarix data.
Sources: Fraunhofer ISE, Photovoltaics Report (14 July 2026); Global Electronics Council, EPEAT-ULCS-2023.
04
Module prices have fallen on a steady learning curve for five decades. Project costs depend on more than the module: U.S. utility-scale costs rose after 2022 with higher capital and financing costs, and as projects moved to less sunny regions.
Sources: VDMA ITRPV 17th Edition (2026); Lawrence Berkeley National Laboratory, Utility-Scale Solar, 2026 Edition (October 2026; levelized cost without tax credits, 2024 and 2025 values preliminary); U.S. DOE Solar Energy Technologies Office 2030 goals (2021), unsubsidized, average U.S. resource. The DOE figure is a policy goal, not a projection.
05
Fielded modules lose about half a percent of output a year at the median. Independent testing shows that quality still varies widely between manufacturers and bills of materials.
Sources: Jordan & Kurtz, Progress in Photovoltaics (2013); Jordan et al., “Photovoltaic fleet degradation insights,” Progress in Photovoltaics (2022); Kiwa PVEL, PV Module Reliability Scorecard (May 2026), as reported by PV Tech and pv magazine.
06
Data center electricity demand is rising fast and the range of forecasts is wide. Utility-scale solar supplied nearly half of new U.S. generating capacity in 2025.
Figure 5Includes projections
Lawrence Berkeley National Laboratory’s 2025 Update estimates that U.S. data centers used 192 TWh, 4.7% of U.S. electricity, in 2024. It projects 464 TWh in 2028 and puts 2030 at 11.8% in the reference case, within a 9.5% to 15.3% range.
07
Several next-generation technologies are past the laboratory. Their status, as of November 2026:
| Technology | Status, November 2026 | Evidence |
|---|---|---|
| Back-contact cells (TBC, HBC) | Mass production | Up to 28% of cells by 2036 (projection) |
| Copper-containing metallization for heterojunction | Early commercial | Copper-containing pastes in use; plating under 10% share |
| Busbarless (0BB) cell layouts | Scaling | ~48% of cells by 2036 (projection) |
| Thinner heterojunction wafers | Roadmap | 100 µm minimum for heterojunction G12 wafers by 2036 (projection) |
| Perovskite-silicon tandem modules | Early commercial, small volume | Oxford PV shipped 24.5% modules from a pilot line in 2024. ITRPV’s survey expects tandem mass production to begin around 2027, with tandem cells appearing in the market after 2028, and says the start remains “extremely difficult to predict.” |
Sources: VDMA ITRPV 17th Edition (2026); Oxford PV announcement as reported by pv magazine and Solar Power World (5 September 2024). Projections labeled.
This outlook reports third-party data only. It does not describe Solarix products. Product specifications are on the Utility ULTRA HJT page.
Measured values are drawn solid; projections are dashed and labeled. Industry figures are averages or medians across manufacturers, not Solarix data. Laboratory cell, laboratory module, commercial module and mass-production averages are identified each time an efficiency appears. Where sources give a range, the range is shown.
Primary sources: VDMA ITRPV 17th Edition (June 2026); Fraunhofer ISE Photovoltaics Report (July 2026); Lawrence Berkeley National Laboratory, Utility-Scale Solar 2026 Edition, Data Center Energy Usage Report: 2025 Update; Niewelt et al. (2022); Bolinger & Bolinger (2022); Jordan & Kurtz (2013); Jordan et al. (2022); Kiwa PVEL Scorecard (2026); IEA, Key Questions on Energy and AI (2026); U.S. DOE SETO (2021); Global Electronics Council EPEAT-ULCS-2023.
Updated annually as new editions publish: ITRPV in June, Fraunhofer ISE in July, LBNL in autumn, Kiwa PVEL Scorecard each spring. Last updated November 2026.